City Was ‘Required’ To Open Downtown Bridge Despite Heat To Allow Cruise Ship To Pass, Officials Say

Source block-club-chicago
Original Load Date Sept. 4, 2026, 3 p.m.
Last Updated Sept. 4, 2026, 3 p.m.
Original URL https://blockclubchicago.org/2026/09/04/city-was-required-to-open-downtown-bridge-despite-heat-to-allow-cruise-ship-to-pass-officials-say/

Article Preview

DOWNTOWN — Federal regulations required the city to open the DuSable Lake Shore Drive bridge for a passing vessel Wednesday despite the extreme heat that caused it to malfunction, according to the Chicago Department of Transportation. As a result, [ the bridge failed to fully close for more than fo...