| Source | NBC Local |
|---|---|
| Original Load Date | July 11, 2026, 9:01 p.m. |
| Last Updated | July 11, 2026, 9:01 p.m. |
| Original URL | https://www.nbcchicago.com/news/local/deep-tunnel-reservoir-will-take-at-least-a-month-to-drain/3960345/ |
Article Preview
The massive Thornton reservoir, a south suburban quarry holding billions of
gallons of stormwater and sewage that nearly filled up this past week, will take
at least a month before it drains.
Thornton is part of the Deep Tunnel flood-control system and resembles a canyon
in South Holland. It takes ...